Display Contract DetailsThis page displays the details of the contract.
Visit our detailed help page
or click the
|
| Public Authority | Public Transport Authority |
| Address | 116 West Parade, Perth, WA, Australia, 6000 |
| Title | Claisebrook Fleet Engineering Study |
| Reference Number | PTA240297 |
| Description | The Public Transport Authority (PTA) is currently undertaking the procurement phase of the High-Capacity Signalling (HCS) Project for a new, Communications Based Train Control (CBTC) system. The CBTC system will replace the existing fixed block signalling system and control system. This new system will allow increased service frequencies to meet rail demand forecast under long-term transport demand planning. The scope of the HCS project will include the provision of:
The HCS Project requires the services of a suitably qualified and experienced Structural Engineering Consultant to undertake engineering investigation works in the Diesel Multiple Unit (DMU) railcar maintenance shed at Claisebrook Depot. |
| Type of Work | Goods and Services |
| Procurement Method | Panel
PTA190058 - Engineering Assurance, Design and Investigation Services Panel |
| UNSPSC 1 | Railway depot - (100%) |
| Region/s | Perth Metropolitan |
| Number of Submissions | 1 |
| Panel Contract | No |
| Contract Term | Fixed Period |
| Closing Date | 4 Apr, 2024 |
| Award Date | 8 May, 2024 |
| Final Expiry Date | 7 Aug, 2024 |
| Original Contract Value | $79,723 (Estimate) |
| Actual Contract Expenditure | $79,723 |
| Contract Developer | Fatima Moosa |
| Phone | OFFICE: (08) 93262164 |
| fatima.moosa@pta.wa.gov.au |
Actual Expenditure |
|||||
| Expenditure Period: | 08/05/2024 - 07/05/2025 | Expenditure $: | $79,723 | ||
Contractors |
|
| 1) |
GHD Pty Ltd
999 Hay Street
Perth WA Australia 6000 |