Select your primary email address for the authentication token to be sent to.
| Primary |
|---|
Select your primary email address for the authentication token to be sent to.
| Primary |
|---|
Display Contract DetailsThis page displays the details of the contract.
Visit our detailed help page
or click the
|
| Public Authority | Public Transport Authority | |||||||||||||||
| Address | 116 West Parade, Perth, WA, Australia, 6000 | |||||||||||||||
| Title | Supply of Point Operating Equipment |
|||||||||||||||
| Reference Number | PTA170809 | |||||||||||||||
| Description | PTA’s Network and Infrastructure division is upgrading point operating equipment across the network to address degradation and improve reliability of points and crossings. The timely supply of materials will be required to support this program during the financial year 2016/17. The project will replace S700K point machines and operating equipment with M3A point machines and operating equipment. Designs for the point operating assemblies for 1 in 12 and 1 in 16 turnout have been produced. The scope is to supply point operating assemblies to include rodding, brackets and components to operate the configurations outlined in Table 1 below. These assemblies will be required for the delivery program in the 2017/18 financial year.
Table 1: Assemblies required for 2017/18 financial year delivery schedule
The assembly drawings include the schedule of materials required and are included in Annex A. There have been a number of minor amendments to these drawings. These changes have been summarised in Annex B. It should be noted that M3A point machines and U5A circuit controllers are excluded from the scope of supply. The revised assembly drawings are expected to be available on commencement of the contract. The supplier must provide certificates of conformance to certify the quality of the components.
|
|||||||||||||||
| Type of Work | Goods and Services | |||||||||||||||
| Procurement Method | Quotation | |||||||||||||||
| UNSPSC 1 | Structures and Building and Construction and Manufacturing Components and Supplies - (100%) | |||||||||||||||
| Region/s | Perth Metropolitan | |||||||||||||||
| Number of Submissions | 3 | |||||||||||||||
| Panel Contract | No | |||||||||||||||
| Contract Term | One Off | |||||||||||||||
| Closing Date | 12 Oct, 2017 | |||||||||||||||
| Award Date | 17 Nov, 2017 | |||||||||||||||
| Commencement Date | 17 Nov, 2017 | |||||||||||||||
| Initial Expiry Date | 23 Feb, 2018 | |||||||||||||||
| Final Expiry Date | 23 Feb, 2018 | |||||||||||||||
| Original Contract Value | $145,386 (Estimate) | |||||||||||||||
| Actual Contract Expenditure | $145,386 | |||||||||||||||
| Contract Developer | Siobhan Stafford | |||||||||||||||
| Phone | OFFICE: (08) 65512020 | |||||||||||||||
| tenderstest@finance.wa.gov.au |
Actual Expenditure |
|||||
| Expenditure Period: | 17/11/2017 - 16/11/2018 | Expenditure $: | $145,386 | ||
Contractors |
|
| 1) |
Wabtec Control Systems Pty Ltd
Level 1
28 The Esplanade PERTH WA Australia 6000 |